Squander Tyre commaTire Recycling EPTry
hydraulic technique comma effortless operation and safe period
Mechanical description colon the tires far more than 800 need to minimize comma and cut into four parts in EPT periodthe dimensions of piece is 200-500mm interval
Notes for employing tire cutter colon
a period Inspect the knives usually comma if seem clear blunt comma it need to be keep well timed comma and the services is two-three a long time interval
b interval the oil in hydraulic station ought to be filtered and transformed routinely interval EPTly filter once every single one and 50 percent calendar year period of time
c period of time Putting on elements colon rubber seals comma sent with one more set when ship the EPT to the consumer period of time
3 amp4 time period EPT tire shredEPTZPS-900
Use colon
This EPT can directly crush tires more compact than 800mm tires interval At the EPT temperature comma can be place immediately crushed into fifty ast fifty mm block comma so the next rotating can grind into 10-thirty meshes or wire and fiber separation equipment period
Characteristic colon
This EPT is a compact structure comma innovative technologies comma lower energy intake comma large efficiency comma smashing off the take a look at area for the framework comma maintenance is specifically practical semi tools with carbide surfacing engineering comma large hardness comma high dress in resistance comma and repeated restore using comma so has a EPTer support existence semi rotary monitor for the lattice structure of steel mesh comma blanking big location comma enabling the screening of certified rubber time period Following the partition of large tires can obtain the influence of the identical excl
Mechanical description colon the tires of 800mm diameter and rubber ring can straight be broken into fifty ast50 mm of rubber block period of time
Notes for using EPT tire shredder colon
a period of time Inject gear oil into EPT oil lparhypoid equipment oil rpar comma primary bearings use calcium-dependent grease lubrication comma a few months after the operation of the EPT comma the oil need to be changed and clean the gas tank time period Given that then adjust the oil as soon as time every year time period
b Soon after deal with 3 comma000 tons of squander rubber lparin typical situation rpar commathe purchaser must grind the blade cutting edge once time time period The blades is the use areas comma the EPT support daily life is five-six several years comma when offering the EPT to the purchaser comma the shredEPTwill be outfitted with edge hardness layer patching material lparelectrodes rpar time period
five period Double Rolls Rubber Crusher XKP-560
Use colon
Mainly utilised for crack massive rubber blocks into forty-50mm little rubber blocks period of time
Specialized parameters colon
Framework colon The rollers undertake alloy chilly difficult solid irons with use-resisting comma sturdy characters period of time The mill flour is with teeth comma substantial groove time period
In orEPTto increase the services existence of the cracker comma we propose build foundations for rubber cracker time period
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and difficult equipment surface area EPT with lower noise and EPTer services daily life period
5Our crackers are designed XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with wonderful working platforms comma all the wires will be related nicely from managing method to motor period When making use of the EPT comma the consumers just need to link directly to the EPT period of time
Waste Tyre commaTire Recycling EPTry
No period of time | Identify | Model | Qty period of time lparQty rpar |
Motor EPT lparKW rpar | ||
1 | Solitary hook debeader | LSJ-1200 | 1 | eleven | ||
two | EPT tyre cutter | QDJ-1200 | one | five period5 | ||
3 amp4 | EPT tyre shredder lparwith conveyor rpar |
ZPS-900 | 1 | 61 period5 | ||
5 | Double Rolls Rubber Crusher | XKP560 | 1 | ninety | ||
6 | Huge conveyor products | BCL-eight | one | 2 | ||
7 | Small conveyor tools | BCL-three | 1 | one period1 | ||
eight | Big Magnet separator | BMS22 | 1 | two period2 | ||
9 | Little Magnet separator | SMS-1 | one | 1 period1 | ||
10 | Large Shaking display | BSS-eight | 1 | 7 period5 | ||
eleven | Tiny Shaking display | SSS-3 | one | three | ||
12 | Fiber separator | FS110 | one | five period5 | ||
thirteen | Fine Rubber Powder Pulverizing EPT | XJFS-420 | four | 123 | ||
Square vibrating sieve | 600 | 1 | ||||
Rubber powder collector | JFS500 | 1 | 7 period5 plus0 period75 equals8 period25 | |||
Screw conveyer | Phi200mm | 1 | period75 | |||
Screw conveyer | Phi132mm | 1 | period75 | |||
Storage pin | 1 period5cbm | one | ||||
Hopper | 1 | |||||
Belt conveyer | 1 | period75 | ||||
fourteen | Metal Baller EPT | 30T | one | 7 period5 | ||
fifteen | Rubber powder EPT EPT | one | 3 | |||
24 | 334 period4KW |
No | Name | model | quantity | EPT | ||
EPT tire pre-processing comma you will get lt 50 ast50MM rubber crumb | ||||||
one | Ring cutter | QQJ-1200 | 1 | five period5KW | ||
2 | Loop EPT | YQJ-295 | one | 15KW | ||
3 | Strip cutter | QTJ-370 | one | 5 period5 KW | ||
4 | Block cutter | QKJ-two hundred | 1 | 11 KW | ||
Rubber powder processing colon you will get twenty-30 mesh rubber powder commaat the identical time comma different the fiber and metal wire | ||||||
five | Tyre crusher | XKP400 | 1 | forty five KW | ||
XKP450 | 55 KW | |||||
XKP560 | 75 KW | |||||
6 | Large conveyor products | BCL-eight | one | two KW | period | |
7 | Small conveyor tools | BCL-three | one | 1 period1 KW | ||
8 | Big Magnet separator | BMS22 | 1 | two period2 KW | ||
9 | Little Magnet separator | SMS-one | one | one period1 KW | ||
ten | Big Shaking screen | BSS-8 | 1 | seven period5 KW | ||
11 | Modest Shaking display | SSS-three | interval | one | 3 KW | |
twelve | Fiber Separator | FS110 | 1 | eleven KW |