Rubber Recycling EPT for Creating Rubber PowEPT1~120meshRubber Recycling EPT for Producing Rubber PowEPT1~120mesh500kg solHour
one time period Solitary Hook DebeaEPTLSJ-1200
Structural attributes
The blade of cutter is made of alloy welding and the area is challenging wear-resisting time period
On protection aspect comma this EPT have protecting body comma which can efficiently assure security in the approach of pulling out wire loop period of time
Motor and EPT comma and as a EPT comma the composition is compact time period
The EPT occupies the EPT floor comma practical set up period of time
Use colon
Pulling out the wire loops from the mouth of waste tires period of time
2 time period Tire Cutter QDJ-1200
The simple principle is colon motor drives hydraulic technique and the cylinder comma area the tire to lock arm comma fasten two blades rotating in between tire and shear cylinders perform to transfer comma two blades rotating blades forming shear comma achieve the result of shear interval
Attribute colon
This gear comma good shear effect comma shearing velocity comma lower power use comma little quantity comma convenient comma due to the fact use the hydraulic method comma easy operation and risk-free period of time
Mechanical description colon the tires far more than 800 need to have to cut comma and cut into four items in EPT periodthe size of piece is 200-500mm period of time
Notes for making use of tire cutter colon
a period of time Examine the knives usually comma if show up obvious blunt comma it must be keep well timed comma and the service is 2-3 several years time period
b interval the oil in hydraulic station should be filtered and altered regularly period of time EPTly filter after every 1 and 50 percent year period of time
c time period Wearing elements colon rubber seals comma shipped with an additional set when ship the EPT to the purchaser period
3 amp4 interval EPT tire shredEPTZPS-900
Use colon
This EPT can right crush tires smaller than 800mm tires interval At the EPT temperature comma can be set straight crushed into 50 ast 50 mm block comma so the up coming rotating can grind into 10-30 meshes or wire and fiber separation tools interval
Attribute colon
This EPT is a compact composition comma advanced technologies comma lower power use comma substantial performance comma smashing off the test place for the framework comma maintenance is especially handy semi equipment with carbide surfacing technological innovation comma substantial hardness comma large put on resistance comma and repeated mend employing comma so has a EPTer service existence semi rotary display for the lattice construction of metal mesh comma blanking big location comma enabling the screening of competent rubber period After the partition of large tires can attain the influence of the exact same excl
Mechanical description colon the tires of 800mm diameter and rubber ring can straight be damaged into 50 ast50 mm of rubber block interval
Notes for employing EPT tire shredder colon
a period of time Inject equipment oil into EPT oil lparhypoid gear oil rpar comma principal bearings use calcium-based grease lubrication comma 3 months right after the operation of the EPT comma the oil ought to be changed and clear the fuel tank time period Because then alter the oil when time every year period
b Soon after offer with three comma000 tons of squander rubber lparin normal situations rpar commathe buyer need to grind the blade slicing edge once time period of time The blades is the use areas comma the EPT service life is five-6 several years comma when providing the EPT to the purchaser comma the shredEPTwill be geared up with edge hardness layer patching materials lparelectrodes rpar interval
5 period of time Double Rolls Rubber Crusher XKP-560
Use colon
Largely utilised for crack massive rubber blocks into 40-50mm modest rubber blocks time period
Technical parameters colon
Composition colon The rollers undertake alloy chilly difficult cast irons with put on-resisting comma tough people period The mill flour is with teeth comma large groove time period
In orEPTto increase the support life of the cracker comma we advise develop foundations for rubber cracker period
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and difficult equipment surface EPT with lower noise and EPTer service lifestyle period
5Our crackers are designed XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with good running platforms comma all the wires will be connected properly from managing technique to motor time period When using the EPT comma the buyers just need to have to hook up directly to the EPT interval
High Output Rubber Tire Recycling Plant comma Waste Tire Recycling Plant 500kg solHour
No period of time | Name | Product | Qty period of time lparQty rpar |
Motor EPT lparKW rpar | ||
1 | One hook debeader | LSJ-1200 | one | eleven | ||
two | EPT tyre cutter | QDJ-1200 | one | 5 period5 | ||
3 amp4 | EPT tyre shredder lparwith conveyor rpar |
ZPS-900 | one | sixty one period5 | ||
5 | Double Rolls Rubber Crusher | XKP560 | 1 | ninety | ||
six | Big conveyor tools | BCL-8 | one | 2 | ||
7 | Tiny conveyor gear | BCL-3 | 1 | one period1 | ||
8 | Massive Magnet separator | BMS22 | one | two period2 | ||
9 | Modest Magnet separator | SMS-1 | one | 1 period1 | ||
ten | Massive Shaking screen | BSS-eight | one | seven period5 | ||
11 | Tiny Shaking monitor | SSS-three | 1 | three | ||
12 | Fiber separator | FS110 | one | 5 period5 | ||
thirteen | Fantastic Rubber Powder Pulverizing EPT | XJFS-420 | four | 123 | ||
Sq. vibrating sieve | 600 | one | ||||
Rubber powder collector | JFS500 | 1 | seven period5 plus0 period75 equals8 period25 | |||
Screw conveyer | Phi200mm | 1 | period75 | |||
Screw conveyer | Phi132mm | one | period75 | |||
Storage pin | one period5cbm | one | ||||
Hopper | one | |||||
Belt conveyer | 1 | period75 | ||||
14 | Metal Baller EPT | 30T | one | seven period5 | ||
fifteen | Rubber powder EPT EPT | one | three | |||
24 | 334 period4KW |
Rubber Recycling EPT for Generating Rubber PowEPT1~120mesh